Skip to content

Meridian Health · Healthcare · 2024

A deploy pipeline that stopped being a quarterly event

Took a regulated healthcare platform from ten-week release trains to daily deploys without loosening a single control.

Release cycle
10 wks → 1dRelease cycle
Change failure rate
-63%Change failure rate
Audit controls retained
100%Audit controls retained

Services

  • Platform & cloud

Stack

  • Terraform
  • GitHub Actions
  • Kubernetes
  • OpenTelemetry

Duration

9 weeks

Start something similar

The problem

Every release required a manual evidence pack assembled by hand. Deploys were rare, enormous, and consequently terrifying.

What we did

  1. 01Automated evidence collection as a pipeline artefact rather than a document.
  2. 02Split the release train into independently deployable services with contract tests.
  3. 03Introduced progressive rollout with automated rollback on error-budget burn.
  4. 04Ran a game day with the on-call rota before switching anything on.

Where it landed

Meridian now deploys on demand. The compliance team reports that evidence quality improved, because a pipeline does not forget steps at 11pm on a Friday.

Next step

Tell us what you’re building.

A 30-minute call with an engineer, not a salesperson. You will leave with a straight answer about scope, cost and whether we are the right people for it.

Or email hello@nexa.com · Austin, Texas · United States